Hokukea Construction (June 2023 – April 2024)
The hull of Hokukea was built at a site about one-hour away from the Hallberg-Rassy yard. Once constructed, it was brought by truck to the boatyard in Ellös. June 2023 September 2023 October 2023 Building the hardtop and installing the windows January 2024 February 2024
Hokukea Construction (June 2023 – April 2024) Read More »
